尼日尔AGADEM油田地面工程项目,油田采油动力电源。采用6台1200kW天然气发电机组,电压10.5kV,以及一台800kW,电压10.5kV作为黑启动电源。电站2010年开始运行,至今运行良好。
6×1200kw gas generator as main power + 1×800kW diesel generator for black start, in desert
area, Niger. Commissioning and Operating began in 2010. Till now the power plant runs well.