1. Basic preparation: Firstly, it is necessary to conduct site survey and design to determine the installation location and foundation requirements of the generator set. Then, carry out foundation construction according to the design requirements, including excavation of foundation pits, pouring of concrete foundations, etc.
2. Handling of generator sets: Transport the generator sets to the installation site and select appropriate lifting equipment for lifting according to the specific situation.
3. Unit installation: Assemble and install the unit based on the relevant equipment platforms and accessories of the generator set. It should be noted that the installation process should strictly follow the technical requirements and installation instructions provided by the manufacturer.
4. Connection pipeline: The pipeline system connecting the generator set and surrounding equipment, including gas pipelines, cooling water pipelines, cables, etc. Ensure that the pipeline connection is correct and stable, and carry out necessary sealing treatment.
5. Debugging and inspection: After completing the installation of the unit, carry out equipment debugging and inspection work. This includes checking whether the pipeline connections are secure and whether the electrical system is operating properly.
6. Balance debugging: Conduct balance debugging on the generator unit, including mechanical balance, electrical balance, etc., to ensure that the equipment can operate normally.
7. Trial operation and debugging: After completing the above steps, proceed with the trial operation and debugging of the generator set. Test the operation, stability, and safety of the equipment, and keep corresponding records.
8. Operation monitoring: After installation is completed, regular operation monitoring and maintenance work should be carried out on the generator set to promptly identify and handle problems.
The above steps are only an overview of the general installation process, which may vary depending on the specific situation and equipment requirements. Before installation, it is recommended to consult and communicate in detail with professional generator set suppliers or installation companies.