Tail gas type: crude purification of coke oven gas
Running time: Official debugging completed in November 2009
Installed capacity: 24 sets of 500kW high hydrogen tail gas generator sets, annual power generation: 60 million kWh
Operation mode: connected to the network for internal power consumption within the enterprise
The domestic smelting industry tail gas power generation project has been upgraded and optimized since 2018. Currently, all electrical controls have been renovated.